What we build
Whole-Home Remodeling in San Antonio
Major renovations that touch several rooms at once, coordinated so the trades work in the right order.

Overview
Several rooms, one plan, one team
A whole-home remodel touches several rooms at once: kitchen, bathrooms, living spaces, ceilings and lighting. The order the trades work in matters as much as the finishes. Ceilings and wiring before paint, plumbing before tile, one room ready before the next is opened up.
ABIA plans the whole house as one project, so each room is done in the right sequence and nothing is done twice. The ceiling and lighting projects on this page are whole-home work: open joists, exposed pipes and loose wiring closed in with a finished ceiling and recessed lighting.
Real projects
Before and after
Drag across each photograph to compare.
-
01Ceiling and lighting upgradeWhole-Home Remodeling


Open joists, exposed pipes and loose wiring closed in with a finished dark ceiling and recessed LED lighting.
-
02Lighting detailWhole-Home Remodeling


A temporary caged bulb replaced with a flush recessed light.
Project types
Three ways to take on a whole home
Before you move in
Renovating a home you have just bought while it is empty, so you move into a finished house.
Room by room, planned as one
The work phased so you can live in the home, with every phase planned from the start.
Top to bottom
Every room taken on in one project, coordinated so the trades follow each other in order.
How a project runs
How a whole-home remodel runs
- 01Talk
We start with your space, your goals and how you want it to work, so the project is understood before anything is priced or planned.
- 02Plan
Scope, design options and the order of work are set out together, so you know what is being built and how it will come together.
- 03City Involvement
Where the work needs it, city approval, plan review and meetings with the city come before construction starts.
- 04Build
The work is coordinated and managed on site, with regular updates so you always know where the project stands.
- 05Finish
Final details are completed and the finished space is walked through with you before the project is closed out.
Why work with ABIA
One team, start to finish
The same team plans, coordinates and manages your project, so nothing is lost between the first conversation and the last detail.
Clear communication
You know what is happening, what comes next and who to ask, before, during and after the build.
Options before construction
Layouts, finishes and design alternatives are talked through early, while changes are still simple to make.
Craftsmanship you can see
Straight lines, clean transitions and finished details. The photographs on this site are the argument.
Cost
What shapes the cost of a whole-home remodel
No two projects are priced the same. These are the things that move the number, and the estimate is built from your space and your choices, after we have seen them.
Request an estimate for your project- Number of rooms
- How many rooms change, and how much in each.
- Layout changes
- Opening up or moving walls adds structural and planning work.
- Existing systems
- The condition of the plumbing, wiring and ceilings once they are opened up.
- Finishes
- Flooring, cabinetry, tile and fixtures across every room.
- Phasing
- Doing the work in phases around your household, or all at once in an empty home.
- City approval
- Where the work needs plan review and approval before construction.
Questions
Whole-Home Remodeling: common questions
If yours is not here, ask it in the form and we will answer it directly.
All questions and answers01Can we live in the house during a whole-home remodel?
Often, yes, when the work is phased so part of the home stays usable. If you have not moved in yet, doing the work while the house is empty is simpler for everyone.
02Should we do everything at once or in phases?
Both work. All at once is usually simpler in an empty home. Phases suit a household living there. Either way, every phase is planned up front so the work fits together.
03How do you keep several trades coordinated?
One team plans the order of work and manages it on site, with regular updates, so you are not the one scheduling electricians around tile setters.
04Will a whole-home remodel need city approval?
Many do, especially where walls, structure or systems change. Where it is needed, city approval and plan review come before construction starts.
05Where do we start?
With a walk through the house and a conversation about how you want to live in it. The scope, design options and order of work come out of that.
Often part of the same project
Whole-Home Remodeling across San Antonio and nearby communities. See where we work.
Start your project
Let's talk about your project.
Tell us what you want to change. We will follow up to talk it through and arrange a time to look at the space.
Or call (830) 415-0737
